Industry: Food & Beverage
Complete electrical and automation installation of a new yoghurt production line.
The client was installing a new production line and required full electrical and automation integration within a tight project window.


Tight shutdown and installation timeframe
Coordination of multiple systems and components
Seamless integration with existing plant infrastructure
Future Electrix deployed a skilled team to deliver the full installation and commissioning.
Pre-works were completed ahead of time where possible to reduce on-site pressure and minimise disruption.
Isolators for safe maintenance
Emergency stop systems for operator safety
Start/stop controls for simple operation
Integrated speed control for process optimisation
Installation completed within required timeframe
Minimal disruption to production
Seamless integration with existing systems
Reliable system performance from day one